IPCS Smart Construction Site · Module

Task Tracking

Track every task from assignment to closeout, with nothing falling through the cracks
  • Task RecordsKeep the assignee, deadline, replies, and attachments together
  • Multiple AssigneesAssign a task to several people, each with their own deadline
  • Completion ReviewAfter completion is reported, the creator confirms or returns it before the task closes
  • Automatic Overdue MarkingManagers see overdue counts and the completion rate for the whole project on one page
  • Model-Based Task CreationWith IPCS Smart BIM, create a task directly from a model element

Problems & solutions

Common problemsAssignments easily get lost

Meeting assignments and group-chat photos end up scattered, and finding the assignee means digging through chat history

How IPCS solves themAssignments become tasks

Assign an owner and a due date, then reply, upload attachments, and mark complete on the same page

BenefitsStatus visible at a glance

Open a task to see its owner and progress, with replies and attachments kept together

Common problemsNo review of completion

The same person reports and confirms completion, so there is effectively no review and problems surface only at acceptance

How IPCS solves themCompletion requires confirmation

A reported completion moves to pending confirmation. The creator confirms or returns it, and the task closes once confirmed

BenefitsDefects caught early

A second person checks every item and returns defects right away, so they don't linger until handover

Common problemsOverdue goes unnoticed

Deadlines are scattered across spreadsheets and people's memory, so no one knows when something is late

How IPCS solves themOverdue flagged automatically

A task past its estimated completion date is flagged overdue, and reports list completion rates and each person's overdue count

BenefitsClear who to chase

No manual tallying: managers see who to follow up with on a single page and can pull an overdue list

Common problemsMultiple crews force split tasks

One item is worked by several crews who finish at different times, so it has to be split into separate tasks

How IPCS solves themMultiple assignees, separate deadlines

Assign one task to several people, each with their own due date. Reassignments keep the full history

BenefitsOne task, start to finish

Review each crew's progress separately. Switching people needs no new task, and the context stays intact

Common problemsRetyping locations to create tasks

A problem found on the model means retyping the location, floor, and drawing number when creating the task

How IPCS solves themCreate tasks from the model

With Smart BIM, click an element and the building, floor, and drawing number fill in automatically

BenefitsProblems logged on the spot

Create a task the moment you spot an issue, with no retyping or typos, and the handler knows the building and floor right away

Want to see how it fits your jobsite?

Tell us about your type of work and how you manage it, and our consulting team will set up a free 30-minute consultation.

Other modules